About IJAZ AHMED MINHAS
-
Academic Level Degree Bachelor
-
Age Above 57 Years
-
Salary 10000
-
Gender Male
-
Industry management
-
Viewed 39
About me
Chemical engineer with over 35 years of cross functional experience (both technical and industrial
administrative management) in Production, Maintenance, Operations, Projects Management with
safety, ISO & Quality Management Standards, Supply Chain Management, Utilities Management,
Asset Management, Logistic & warehouse Management, Stores & Inventory Management with
Largest Manufacturing Plants.
Education
-
1976 - 1981
UNIVERSITY OF ENGINEERING AND TECHNOLOGY LAHORE
CHEMICAL ENGINEERING
Experience
-
2021 - Present
TUFAIL GROUP KARACHI
DIRECTOR PLANT OPERATION & DEVELOPMENT
Overall Responsible for Operation of the plant.
ï‚· Leading & Responsible for Technical and Productions of Lahore, Karachi plants.
ï‚· Erection and Start up responsibility for UAE and KSA plants.
ï‚· Responsible for all new developments being happen within the group.
ï‚· Human Resource development and succession Planning, General Administration, Quality
Control & Quality Assurance with Marketing Department, Material Management, Resource
Management and Mobilization, Operation Management system, Project Management,
Procurement Management and Communication system. Overall responsible for
Maintenance including Projects, Production, Dispatches & Deliveries, Utilities (water, Air
and Steam management), Engineering Department, Raw Material Management &
Inventories, close interaction & advising supply chain department, Planning &
Development, Training Department, Inventories Control, Developing & ensuring use of
SOPs, House Keeping, Accident prevention and Plant Safety.
ï‚· Ensured ISO certifications and regulatory requirements of the business.
ï‚· Reported to Chief Executive Officer and BOD on all Technical matters. -
2020 - 2021
National Petrocarbon (Pvt) Limited, Karachi
GENERAL MANAGER PLANT
Responsible for complete Manufacturing & Operations including Projects, Production,
Maintenance, Boiler Houses, Manufacturing of different grades of Carbon, Dispatches &
Deliveries, Utilities (water conservation and steam management), Engineering department
(electrical, electronics, mechanical, civil), Quality Control & Assurance, Raw Material
Management & Inventories, Planning & Development, Supply Chain, Inventories Control,
Developing & Ensuring use of SOPs, Accident prevention and Plant Safety.
ï‚· Reported to Managing Director. -
2019 - 2020
DS Ideal Engineering Services and Equipment Lahore
Chief Operating Officer
Responsible for the smooth operation of the company to achieve customer satisfaction.
ï‚· Timely delivery and availability of spares and services teams to handle the industrial
requirements quickly and timely.
ï‚· Plan and Implement business strategies.
ï‚· Set comprehensive goals and KPIs for performance growth.
ï‚· Establish policies that promote the company culture and vision.
ï‚· Oversee daily operation of the company and that of executives.
ï‚· Lead employees to encourage maximum performance and dedication.
ï‚· Evaluate the performance by analyzing the data and prepare the matrices to implement for
improvement. -
2016 - 2019
Power Cement Limited (Arif Habib Group), Karachi
Sr. General Manager Operations/Director Operations
Overall responsible for complete Manufacturing & Operations, Maintenance including Projects,
Production, Dispatches & Deliveries, Utilities (Water, Air and Steam management), Engineering
Department, Quarry and Mining, Quality Control & Quality Assurance, Raw Material Management
& Inventories, Close interaction & advising supply chain department, Planning & Development,
Training Department, Inventories Control, Developing & ensuring use of SOPs, Accident
prevention and Plant Safety Management (HSE).
ï‚· Led Succession planning in all departments.
ï‚· Ensured ISO certifications and regulatory requirements of the business.
ï‚· Built and manage good relationships between all stakeholders.
ï‚· Reported to Chief Executive Officer on all Technical matters. -
2013 - 2016
Captain Chemical Industries (CPQ Group) Faisalabad & Karachi
Chief Manufacturing/General Manager Manufacturing
Responsible and led Human Resources, Material Management, Resource Management and
Mobilization, Operation Management system, Project Management, Procurement Management
and Communication system.
ï‚· Overall responsible for complete Manufacturing & Operations of Karachi and Faisalabad plants
including Projects, Production, Maintenance, Boiler Houses, Dissolvers operations, Dispatches &
Deliveries, Utilities (water conservation and steam management), Engineering department
(electrical, electronics, mechanical, civil), Quality Control & Quality Assurance and Marketing ,
Raw Material Management & Inventories, Planning & Development, supply chain department,
Training Department, Inventories Control, Developing & ensuring use of SOPs, Accident
prevention and Plant Safety Management (HSE), Succession planning in all manufacturing
departments.
ï‚· Reported to Managing Director on all Technical matters. -
2013 - 2013
Panther Tyres Limited Sheikhupura Pakistan
General Manager Plant
Responsible and led Human Resources, Material Management, Resource Management and
Mobilization, Operation Management system, Project Management, Procurement Management
and Communication system.
ï‚· Overall responsible for complete Manufacturing & Operations of Karachi and Faisalabad plants
including Projects, Production, Maintenance, Boiler Houses, Dissolvers operations, Dispatches &
Deliveries, Utilities (water conservation and steam management), Engineering department
(electrical, electronics, mechanical, civil), Quality Control & Quality Assurance and Marketing ,
Raw Material Management & Inventories, Planning & Development, supply chain department,
Training Department, Inventories Control, Developing & ensuring use of SOPs, Accident
prevention and Plant Safety Management (HSE), Succession planning in all manufacturing
departments.
ï‚· Reported to Managing Director -
2008 - 2013
Sitara Chemical Industries Faisalabad
General Manager Operations & Works
Overall responsible for complete Works Operation including Production, Maintenance, Boiler
House, Power House, Utilities (water, Air and steam conservation and management),
Engineering department (electrical, electronics, mechanical, civil) Quality Control & Quality
Assurance, Material Management, Planning & Development, Training Department, Inventories
Control, close interaction with supply chain, Developing & ensuring use of SOPs, Accident
prevention and Plant Safety Management (HSE), Energy Conservation.
ï‚· Additionally, was also responsible for enabling best HR Practices and looking after three (03)
business units of the company.
ï‚· Fully protected the works environment from chlorine leakage effect by adopting good operational
practices
ï‚· Performed three Hcl furnaces Project worth millions of rupees on production which were out of
production for so many years by using in house resources.
ï‚· Successfully enhanced production of NH4Cl plant from 10 TPD to 15 TPD. Added Cacl2 pits
system instead of using Baco3 to be more economical material.
ï‚· Introduction of Energy Conservation measures to save millions of rupees in the power
consumption head of the factory
ï‚· Handled harmonic filter Project in the electrical system. Introduced Vibration analysis, condition
monitoring and leakage detection cell. Added new system to control and monitoring effluents
drains. Installed new weigh bridge system. Development of scrap yard & Startup of in house
rotary workshop and cylinder testing workshop.
ï‚· Reported to Managing Director on all matters. -
2004 - 2008
Pepsi Cola Multan
General Manager Technical
Responsible for providing leadership in planning, implementation, Projects management and
supervising work plans for Plant Operation, Production Planning and its Execution, Process,
Utilities (water management, water purification, water reusing and conservation), Quality
Assurance, Repair, Maintenance, Procurement, Store Budgeting, Inventory Control. Mechanical,
Electrical Section, Raw Material Management, Packing, Research & Development. Boilers, Water
Treatment, CO2 plant, Ammonia & Air Compressors, Syrup Room, Seven Production Lines with
Production Capacity of 1,50,00 cases per day and Plant supply chain management.
ï‚· Created and led different teams and individuals to ensure overall quantum and quality of the
work. Managed their performance with provision of clear directions, training, guiding and
counseling to achieve the company goals.
ï‚· Commanded the force of 1200 workers, Technicians and 35 officers in the company.
ï‚· Handled the project of erection of SIMONNAZI production line.
ï‚· Reported to Managing Director on all matters. -
1998 - 2004
Frontier Ceramics Limited (FORTE) Peshawar
Chief Engineer/General Manager Production
Overall responsible for Plant Operation, Production, Utilities(water and steam utilization
management), Maintenance, Stores Inventories, plant supplies management & Administrative
Management Body Preparation, Spray Dryer, Biscuit Kiln, Glost Kiln, Roller kiln, S/Ware Kiln,
Hydraulic pumps, Stirrers, Presses, Mold Shop, Casting Hall, Raw Control & inspection, Sorting,
Grading and Packaging, Mechanical Section, Electrical Section, Research & Development and
Quality Assurance, Glaze Preparation and Glaze Lines sections.
ï‚· Led a work force of 400 workers and 50 officers (this responsibility also includes hiring, firing,
CBA negotiations and demands settlements, company security, time management, personnel
and HR Management).
ï‚· Reported to Managing Director on all matters. -
1982 - 1998
Gharibwal Cement Limited, Distt. Jhelum , Maple Leaf Cement Limited, Distt. Mianwali State Cement Corporation of Pakistan Lahore
Manager Production
Worked as Trainee Engineer at Maple Leaf Cement and later on promoted as Assistant Manager,
Deputy Manager and then Manager (Production) at Gharibwal Cement.
ï‚· Main responsibilities include Shift Management, all types of Breakdown, Repair & Maintenance of
Complete plant during the respective shift. Preparation of Shift production reports and shift
rosters.
ï‚· Responsible for Administration, Operation, Production, Inventory control, Utilities and
Maintenance Management of Mill House Section, Kilns, Furnace Oil preheating plant, Boilers,
slurry blending section, slurry storage silos , slurry pipe lines, feeding tanks, drag chains, storage
yards, oil pumps and oil pipe lines.
ï‚· Reported to General Manager Works on all matters.
Portfolio
Honors & awards
-
1981
Gold medalist in Final year of Engineering in UET Lahore Pakistan
I TOPPED THE DEPARTMENT OF CHEMICAL ENGINEERING IN FINAL YEAR
-
2005
Best Quality Award from Pepsi Cola International UAE
GOT QUALITY AWAED FROM PEPSICO UAE
-
2004
co2 WASTAGE CONTROL AWARD
Introduced first ever CO2 gas wastage system & saved millions of rupees, achieved the dream mark of any bottling company as 12.5 crates per kg of CO2 at Pepsi Cola Multan Pakistan
-
2005
DIRTY BOTTLE CLEANING SYSTEM AWAD
Effectively designed system to minimize dirty bottles thus to improve the life of bottle in glass lane after amending the existing practice and procedures and developed new procedures wherever necessary at Pepsi Cola Multan Pakistan
-
2006
PRODUCTION 15% GROWTH AWARD
Consistently achieved Production Goal with growth of 15% to 25% each year at Pepsi Cola Multan Pakistan
-
2000
QUALITY MANAGEMENT SYSTEM AWARD
Appreciation Letter from CEO of Frontier Ceramics Ltd Peshawar Pakistan for ISO 9000 certifications & QMS and achieving the highest production target ever in the history of the Company
-
2017
HIGHEST PRODUCTION AWARD
Appreciation Letter for achieving Highest Production in the last 20 years in Power Cement Karachi Pakistan
-
2019
PLANT SUSTAINABILITY AWARD
Rehabilitated Power Cement Karachi Pakistan Line I & II and increased sustainability of the plant up to 90% and increase Production from 4.5 Lac to 6.6 Tons per annum
-
2021
LABSA/SLES PLANT ERECTION AND COMMISSIONING IN RECORD TIME
Installed & Commissioned state of the art 50,000 tons per annum - LABSA/SLES/SLS plant from China (February 2021)
-
2017
EP SYSTEM INSTALLED AWARD IN POWER CEMENT
Installed and commissioned successfully dust collectors in collaboration with CTI ITALY and Rabih Trading UAE at both Kilns 1 and 2 costing 421 m at Power Cement Limited Karachi (2016- 2017) (End to End)
-
2014
GASIFIER INSTALLATION AWARD
Planning, resourcing, MOU signing for purchase of Coal Gasifier from China, Fabrication, Shipping, Installation, Erection and commissioning of Coal Gasifier from green field at CPQ Chemical Faisalabad Pakistan (2013-2014). ï‚· (EPC)
-
2008
Wapda load enhancement award
Sitara Chemical Industries Faisalabad Pakistan load from 980 KW to 2000 KW in close coordination with Wapda (2007-2008) (Value improvement project)