About Anees Abbas
-
Gender Male
-
Job Fuction Engineering Management & Leadership Project Management Utilities
-
Academic Level Master’s Degree
-
Viewed 84
About me
Mechanical engineer with over 12 years of diversified power sector experience in Operation, Maintenance, performance, project planning& development, handling multiple projects and managing multidisciplinary teams. Industry proven ability for liaising with suppliers and contractors, resolving complex technical issues and achieving challenging results.
Details of Skills and Experience.
1.Expertise in Gas Engines Jenbacher,MTU,Caterpillar, Steam Turbine ,Air Conditioning / HVAC System Absorption & Electric Chillers
2.Boilers including Gas fired, Coal Fired, Package Boilers, WHRBs.
3.Air Compressors Cooper, Atlas Copco, IR, and Allied Air.
4.Waste water Treatment, RO Plants ( Pakistan, Turkey/Italy Vendors).
5.Fire fighting system with efficient Pump Designs (USA/Italy Vendors).
6.Balance of Plant
7.Pumping Systems Network Developed In-house Grundfoss, KSB, CNP, Pentair Etc.
8. Electrical T&D Systems (Grid + Island, HT, LT).
9. PLC Systems & Related Instrumentation ABB, Schneider, PEL, Siemens, Mitsubishi, Allen Bradley Etc.
10.Utility Companies Dispute Resolution SSGC, KE, KWSB.
11. Thermal Designs, Engineering Economics, Co-Generation, Control System, Procurement Analysis& Cost Cutting, Maintenance and engineering Solutions, Projects Planning and Development, Microsoft office, ERP,MS Project, AutoCAD.
12.Project Feasibility, Pay back IRR, Procurement Planning and Evaluation, inspection, Technical meetings, Commissioning and Performance tests.
13. Environmental Management System compliance (ISO 14001) and Audits related to Utilities, Energy Management System ISO 50001.
14. Second Class Boiler Engineer
Education
-
2019 - 2022
NED UET KARACHI
Masters of Engineering in Energy Management
-
2009 - 2012
QUEST NAWABSHAH
BACHELORS OF ENGINEERING
PASSED
-
2006 - 2008
BISE SUKKUR
HSC
PASSED
-
2004 - 2006
BISE SUKKUR
SSC
PASSED IN A-1 GRADE
Experience
-
2021 - 2025
EBRAHIM TEXTILE MILLS
SENIOR MANAGER UTILITIES, ENGINEERING, PROJECTS PLANNING & DEVELOPMENT
Managing Engineering, all Energy Projects & Mill Utilities Operation and Maintenance including Own Captive Power Plant.
Such as Gas Engines (Jenbacher, MTU, Caterpillar), Gas/ Coal/thermal oil-Fired, Biomass boilers (BONO, Bosh, Cochran,
Beilminster, Razzaq, DDFC, Zozen), Hot water, Caustic recovery Plant, Air Compressors, ETP, RO plants, HVAC Plants Mills
Machine Maintenance and other consumables spares and inventory of a processing unit.
● Achievements:
● Designing, Selection & procurement of Efficient Power Plant Engines, Gas fired boilers, Biomass boilers, PEB
Shades, Ventilation system, cooling towers, Pumping System, Chillers, Pumps, Air compressors and Civil
Constructions etc.
● Exhaust Heat recovery from all heat sources in Power Plant I.e. Jacket Water Heat Recovery, Exhaust Heat
recovery.
● Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant with innovative ideas related to Mechanical &
Electrical works, incorporated with minimum steam consumption. It includes new tank designs, their cleaning mechanisms,
operational procedures and its related recoveries.
● Planning and organization of water sources, specially bore water to get maximum water from UG. Designing
of RO plants on bore water with maximum output.
● Cost Analysis of operations of Utilities and Processing department for maximum saving of allocated powers.
● Designing of renewable power (Solar, Wind) and synchronization with Captive power equipment.
● Feasibilities studies (ROI) on different projects.
● ISO (50001) Energy Management System Implementation.
● Conversion of existing coal fired boiler to Biomass fired -
2018 - 2021
EBRAHIM TEXTILE MILLS
MANAGER PROJECTS DEVELOPMENT / MILL UTILITIES
Managing Engineering, all Energy Projects & Mill Utilities Operation and Maintenance including Own Captive Power Plant.
Such as Gas Engines (Jenbacher, MTU, Caterpillar), Gas/ Coal/thermal oil-Fired, Biomass boilers (BONO, Bosh, Cochran,
Beilminster, Razzaq, DDFC, Zozen), Hot water, Caustic recovery Plant, Air Compressors, ETP, RO plants, HVAC Plants Mills
Machine Maintenance and other consumables spares and inventory of a processing unit.
● Achievements:
● Designing, Selection & procurement of Efficient Power Plant Engines, Gas fired boilers, Biomass boilers, PEB
Shades, Ventilation system, cooling towers, Pumping System, Chillers, Pumps, Air compressors and Civil
Constructions etc.
● Exhaust Heat recovery from all heat sources in Power Plant I.e. Jacket Water Heat Recovery, Exhaust Heat
recovery.
● Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant with innovative ideas related to Mechanical &
Electrical works, incorporated with minimum steam consumption. It includes new tank designs, their cleaning mechanisms,
operational procedures and its related recoveries.
● Planning and organization of water sources, specially bore water to get maximum water from UG. Designing
of RO plants on bore water with maximum output.
● Cost Analysis of operations of Utilities and Processing department for maximum saving of allocated powers.
● Designing of renewable power (Solar, Wind) and synchronization with Captive power equipment.
● Feasibilities studies (ROI) on different projects.
● ISO (50001) Energy Management System Implementation.
● Conversion of existing coal fired boiler to Biomass fired -
2015 - 2018
OMNI POWER PVT LTD
PLANT MECHANICAL ENGINEER / MANAGER UTILITIES
● Managing all Energy Projects & Utilities including Captive Power Plant
● O & M on 13.2 MW Power Plant Comprising of JGS620-F Jenbacher Gas Engines.
May 2015 To July 2018
● Project Management, Commissioning, Operation and Maintenance of Combine Cycle Waste Heat Recovery Boiler with 900
kWe Steam Turbine and Balance of Plant.
● Project Management, Commissioning and Operation of hot water Lithium Bromide absorption Chiller on Jacket
Water of JGS 620-F Jenbacher gas Engines.
● Cost Analysis of operations of Utilities and department for maximum saving of allocated powers.
● Developed full-scale project plans and associated communications documents.
● Effectively communicated project expectations to team members in a timely selected slot.
● Procurement of machine parts, machines, engineering tools and other accessories by negotiating with
suppliers keeping in view changes in the demands.
● Coach, mentor, motivate and supervise project team members and contractors, and influence them to take positive
action and accountability for their assigned work.
● Proactively managed changes in project scope by identifying potential crises, and devised contingency plans. -
2013 - 2015
EBRAHIM TEXTILE MILLS
UTILITY ENGINEER
Key responsibilities as MECHANICAL/UTILITY ENGINEER
● To monitor and keep daily records, shifts, machine wise.
● To plan Maintenance activities in concerned section.
● To monitor day to day operation.
● To maintain the documents.
Portfolio
Honors & awards
-
2024
Second Class Boiler Engineer Competency Certification.
High level performance
-
2010
AutoCAD, PLC Certification
